WATER TRANSMISSION PIPELINE SYSTEM - BAKHENG WATER TREATMENT PLANT – STAGE 3 (CAMBODIA)

  • Project name
    WATER TRANSMISSION PIPELINE SYSTEM - BAKHENG WATER TREATMENT PLANT – STAGE 3 (CAMBODIA)
  • Location
    Win Win Blvd, Bakheng Loeu Village, Sangkat Bakheng, Khan Chroy Changva, Phnom Penh Kingdom of Cambodia
  • Client
    Phnom Penh Water Supply Authority - Nhà thầu: Branch Of VINCI Construction Grands Projets S.A.S

Pipeline Fabrication, Manufacturing and Delivery.

1. Project Overview.

FINE is executing the scope of fabrication and manufacturing of water transmission pipeline systems for the Bakheng Water Treatment Plant – Stage 3, one of the key water infrastructure projects in Cambodia.

The scope is carried out under contract with VINCI, serving the construction and completion of the water treatment plant for the Phnom Penh Water Supply Authority (PPWSA).

2. Scope of Work and Fabrication Process.

All pipeline components are fabricated and manufactured at FINE’s workshop, in strict compliance with approved drawings, technical specifications, and quality control procedures. The main fabrication stages include:

  • Cutting and forming of steel pipes in accordance with approved drawings;
  • Welding assembly and finishing works;
  • Dimensional and quality inspection;
  • Application of internal and external protective coating;
  • Packing, loading, and transportation for delivery.

The entire fabrication process is continuously supervised by FINE’s engineering and QA/QC teams, together with third‑party inspection, ensuring that all products fully meet project requirements for quality, safety, and long‑term operational performance.

20260305 100315

20260309 152735

20260416 074240

IMG 20260118 102555

z7771332181775 5e4ab7a4927aa0a97781029c7ab8655c

IMG 20260118 080732

3. Second Shipment and Upcoming Deliveries.

The attached images document the second shipment in FINE’s supply sequence for the Bakheng Water Treatment Plant – Stage 3 project.

Upon completion, the pipeline components are securely packed, properly restrained, and transported by specialized vehicles to the project site, where they are handed over to VINCI for further installation and integration into the overall plant system.

According to the project execution plan, additional fabrication and delivery batches will continue in the coming period, in line with site installation progress and project scheduling requirements.

20260306 113423 1

20260402 073431

20260328 115146

z7683647178069 52b053ebbb71dfd84e388e10dc950e74

z7683647128427 7da6e1dcc081dee72b303581c9247220

z7683647152216 2712876d91337133ebf7283ecd2230d8

20260406 154448

20260420 161905

20260420 161533

4. Project Significance.

This scope further demonstrates FINE’s capability in:

  • Fabrication and manufacturing of large‑diameter pipeline systems for water infrastructure projects;
  • Quality and schedule management across multiple delivery batches;
  • Effective coordination with international EPC contractors on large‑scale infrastructure projects.

FINE is proud to contribute to projects that support sustainable urban infrastructure development and improved community living standards.

CONTACT FINE.

FINE is ready to support Clients and Partners with mechanical fabrication, pipeline systems, industrial equipment, and engineering solutions for infrastructure and industrial projects.

For further information or project inquiries, please contact:

FABRICATION INSPECTION AND ENGINEERING JSC (FINE)

  • Website: www.finejsc.com
  • Email: info@finejsc.com
  • Hotline: +84 (0)82 658 3979

FINE is committed to delivering reliable, high‑quality engineering solutions tailored to each project’s requirements.

  • ishare1
  • ishare2
  • ishare3

Contact us

We're here to help! Please fill out the form below, and our specialists will get in touch with you shortly to discuss your needs.